免费国产精品黄色一区二区-日本熟女五十路六十路熟女-国产日韩欧美另类在线综合-亚洲一区二区中文字幕无线乱码

濟(jì)南蓬發(fā)建材有限公司為您提供臨邊護(hù)欄、木工防護(hù)欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請(qǐng)關(guān)注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機(jī): 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://iquanttrade.com/

地址:山東省濟(jì)南市章丘圣井工業(yè)園

在搭設(shè)木工加工棚時(shí)要了解到施工要點(diǎn)

來(lái)源:http://iquanttrade.com/   發(fā)布時(shí)間:2022-12-19

由于木工加工棚的施工質(zhì)量會(huì)對(duì)后期使用的產(chǎn)生較大影響,因此,在搭設(shè)木工加工棚的過(guò)程中應(yīng)注意以下施工要點(diǎn)。
Since the construction quality of woodworking shed will have a great impact on the safety of later use, the following construction points should be paid attention to during the erection of woodworking shed.
(1)施工前,應(yīng)先編制詳細(xì)的木工加工棚施工方案,并在開始施工時(shí)先對(duì)木工加工棚范圍內(nèi)的兩側(cè)道路進(jìn)行整平、拓寬作業(yè),設(shè)置排水溝,以確保排水暢通,適應(yīng)吊車站位及吊裝。
(1) Before construction, a detailed construction plan for the woodworking shed shall be prepared. At the beginning of construction, the roads on both sides of the woodworking shed shall be leveled and widened, and drainage ditches shall be set to ensure smooth drainage and adapt to the crane station and hoisting.
(2)若木工加工棚的基礎(chǔ)施工范圍內(nèi)光纜、電力線眾多,還應(yīng)制訂光纜、電力線等設(shè)備的改移方案,以及相關(guān)保護(hù)措施,以確保施工和設(shè)備。
(2) If there are many optical cables and power lines within the foundation construction scope of the woodworking processing shed, the relocation scheme of optical cables, power lines and other equipment, as well as relevant protective measures, should also be formulated to ensure construction safety and equipment safety.
(3)木工加工棚施工時(shí),其焊接作業(yè)的過(guò)程一定要注意防火,如果有風(fēng)必須設(shè)置好擋風(fēng)板,以免發(fā)生火花飛濺,造成隱患。同時(shí),木工加工棚上不得堆放雜物,以及鋼筋、模板等材料,以防發(fā)生火災(zāi)。
(3) During the construction of the woodworking shed, attention must be paid to fire prevention during the welding operation. If there is wind, the wind deflector must be set up to prevent sparks from splashing and causing potential safety hazards. At the same time, no sundries, reinforcement, formwork and other materials shall be stacked on the woodworking shed to prevent fire.
木工加工棚
(4)按木工加工棚的矩型管立桿間距、排距要求進(jìn)行定位放線,并將墊板鋪設(shè)放平穩(wěn),不得懸空。同時(shí),矩型管立桿接長(zhǎng)應(yīng)采用對(duì)接電焊連接,立桿對(duì)接電焊焊接應(yīng)交錯(cuò)布置。
(4) The positioning and setting out shall be carried out according to the requirements for the spacing and row spacing of rectangular pipe poles in the woodworking shed, and the base plate shall be laid stably and shall not be suspended. At the same time, the extension of rectangular pipe upright shall be connected by butt welding, and the butt welding of upright shall be staggered.
(5)木工加工棚棚頂鋪裝施工時(shí),均應(yīng)在既有線上方作業(yè),且須注意高空作業(yè),嚴(yán)禁任何機(jī)具和材料意外掉落損壞線路設(shè)備。同時(shí),應(yīng)通過(guò)鋼管立柱,在木工加工棚兩側(cè)設(shè)置接地措施。
(5) When paving the roof of the woodworking shed, work above the existing line, and pay attention to the safety of working at heights. It is strictly forbidden to accidentally drop any machines and materials to damage the line equipment. Meanwhile, grounding measures shall be set on both sides of woodworking shed through steel pipe column.
此外,木工加工棚在搭設(shè)完成后,施工單位應(yīng)先組織領(lǐng)導(dǎo)小組組長(zhǎng)及員、質(zhì)檢員等進(jìn)行驗(yàn)收,自檢合格后報(bào)請(qǐng)監(jiān)理單位進(jìn)行驗(yàn)收,驗(yàn)收合格后方可進(jìn)行使用。更多相關(guān)內(nèi)容就來(lái)我們網(wǎng)站http://iquanttrade.com咨詢吧!
In addition, after the woodworking shed is erected, the construction unit shall first organize the leader of the safety leading group, the safety officer, the quality inspector, etc. to carry out acceptance. After the self inspection is qualified, the woodworking shed shall be submitted to the supervision unit for acceptance. The woodworking shed can only be used after the acceptance is qualified. More relevant content will come to our website http://iquanttrade.com Consult!