搭設(shè)加工棚的技術(shù)措施是什么

來源:http://iquanttrade.com/   發(fā)布時間:2022-09-19

工地上安裝木工加工棚的目的是為了增強(qiáng)加工棚的系數(shù),防止工人在施工的時候,出現(xiàn)危險,造成更大的傷害,為此我們要為施工場所搭建加工棚,下面我們將為大家詳細(xì)的總結(jié)一下搭建加工棚的技術(shù)措施。
The purpose of installing the woodworking shed on the construction site is to enhance the safety factor of the processing shed and prevent workers from being exposed to danger and causing greater harm during construction. Therefore, we need to build the processing shed for the construction site. Now we will summarize the safety technical measures for building the processing shed in detail.
1、鋼筋棚立桿在澆筑混凝土樓板上搭設(shè),鋪跳板和墊板。
1. The vertical pole of the reinforcement shed shall be erected on the poured concrete floor, and the springboard and base plate shall be paved.
2、定期檢查鋼筋棚,發(fā)現(xiàn)問題和隱患,施工前及時維修和加固,以達(dá)到穩(wěn)固穩(wěn)固,確保施工。
2. Regularly check the reinforcement shed, find problems and hidden dangers, and timely repair and reinforce them before construction to achieve stability and ensure construction safety.
3、鋼棚搭設(shè)人員要持證上崗,并正確使用帽、帶,穿防滑鞋。
3. The steel shed erection personnel shall work with certificates, correctly use helmets, safety belts and wear anti-skid shoes.
4.嚴(yán)禁將腳手板放在地面上。鋪設(shè)腳手板和多層作業(yè)時,盡量平衡施工荷載的內(nèi)外傳遞。
4. It is forbidden to put the scaffold board on the ground. When laying scaffold boards and multi-layer operations, try to balance the internal and external transmission of construction loads.
5、在圍欄周圍設(shè)置繩索或豎立警示牌,地面應(yīng)設(shè)專人指揮,禁止非操作人員進(jìn)入。
5. Ropes or warning signs shall be set up around the fence, and special personnel shall be assigned on the ground to command and prohibit non operators from entering.
6、鋼筋棚支搭,經(jīng)項(xiàng)目部員驗(yàn)收合格后方可使用。
6. The steel bar shed can be used only after being accepted by the safety officer of the Project Department.
7、嚴(yán)格控制施工荷載,腳手架不得集中堆放荷載,以保證更大的儲備。
7. The construction load shall be strictly controlled, and the scaffold shall not be stacked with loads in a centralized way to ensure greater safety reserve.
木工加工棚
加工棚搭設(shè)和拆除時,應(yīng)避免上下同時作業(yè),錯開作業(yè)時間。架設(shè)和拆除加工棚時,所有材料和工具應(yīng)堆放在建筑物外緣少2m以內(nèi),堆放高度不得超過1m。拆除的材料需要及時轉(zhuǎn)移到地面并運(yùn)走,嚴(yán)禁高空拋擲。
During the erection and removal of the processing shed, it shall be avoided to work up and down at the same time and stagger the operation time. When erecting and dismantling the safe processing shed, all materials and tools shall be stacked within at least 2m of the outer edge of the building, and the stacking height shall not exceed 1m. The dismantled materials shall be transferred to the ground and transported away in time. It is strictly prohibited to throw them from high altitude.
在搭建和拆除加工棚時,應(yīng)在地面設(shè)置警戒區(qū),并派專人進(jìn)行監(jiān)控。搭建和拆除加工棚時,應(yīng)有專人指揮。
When setting up and removing the safe processing shed, a warning area shall be set up on the ground and a special person shall be assigned to monitor it. When setting up and removing the safe processing shed, there should be a specially assigned person to command.
搭建加工棚的技術(shù)措施,上述內(nèi)容中已經(jīng)為大家詳細(xì)的總結(jié)完了,我們了解到,加工棚在安裝的時候,一定要做好材料之間的連接工作,棚子搭建完畢后,在安裝和拆除的時候,應(yīng)進(jìn)行技術(shù)交底。
The safety technical measures for the construction of the processing shed have been summarized in detail. We understand that the processing shed must be well connected with materials during installation. After the construction of the shed, safety technical disclosure should be conducted during installation and removal.
雨天和大風(fēng)天氣應(yīng)暫停加工棚的搭設(shè)和拆除施工,并檢查和維護(hù)單柱加工棚的性。加工棚搭設(shè)完成后,經(jīng)專職員驗(yàn)收合格后投入使用。在安裝和拆除水平防護(hù)之前,應(yīng)進(jìn)行技術(shù)交底。關(guān)注我們http://iquanttrade.com,了解更多相關(guān)事項(xiàng)!
The erection and removal of the safe processing shed shall be suspended in rainy and windy days, and the safety of the single column processing shed shall be checked and maintained. The processing shed shall be put into use after being erected and accepted by the full-time safety officer. Safety technical disclosure shall be conducted before installation and removal of horizontal protection. Follow us http://iquanttrade.com , learn more about it!